Royal Arsenal History
  • Home
  • About RAH
  • RAH Tours registration
  • Standard Tour
  • Extended Tour
  • Support RAH
  • RAHistorical Vehicle Photos
  • Royal Arsenal Maps
    • 1700's Maps
    • 1800's Maps
    • 1900's Maps
    • Todays Maps
    • Map overlays
    • Maps unpublsihed
  • Royal Arsenal Timeline
  • Video Presentations - Secret City
  • Royal Arsenal Blog / Forum
  • Overview
  • Royal Arsenal West - Woolwich
  • Royal Arsenal Departments
  • Building numbers, Photos & Maps
  • Royal Arsenal Buildings & Photos
  • Royal Arsenal Railway
  • Woolwich (Video Archive)
  • Woolwich
  • Royal Arsenal East - Thamesmead
    • Ghost Storys from Thamesmead
  • Berber (Thamesmead)
  • Thamesmead SE28 - A New Town (Video Archive)
  • Magazines (Tumps)
  • Royal Arsenal Football
  • Royal Arsenal Rules
  • Royal Arsenal Firepower - Guns
  • Royal Arsenal Explosions
  • Royal Arsenal Site Development
  • Royal Arsenal Archaeology
  • Royal Arsenal Piers
  • Canal, Lock, Dock & Swing Bridge
  • Woolwich Arsenal Prison Hulks
  • Royal Arsenal Wasteland (East)
  • Royal Arsenal Bombs and Dropped
  • Royal Arsenal Bullets
  • Royal Arsenal Women Workers
  • Filling Factories
  • Royal Ordnance Factories (ROFs)
  • Royal Arsenal Employee's
  • Housing the Workers
  • Police and Fire Brigade
  • Royal Arsenal Telephone Exchange
  • Royal Arsenal Transport
  • Royal Arsenal Paymaster
  • Royal Arsenal Medical - Surgery
  • Life in the Royal Arsenal
  • Royal Arsenal Then and now
  • Project Hurricane (Atomic)
  • Royal Arsenal Stories
  • R.O.F.S.A Sports
  • Royal Arsenal and the Final Years
  • Crossness (East)
  • Royal Arsenal Photos by year
  • The Royal Arsenal Marshes
  • Regiment of Artillery
  • Royal Dockyards
  • Prison Hulks
  • Architecture
  • Artifacts
  • Reprographics Department
  • Family Royal Arsenal research
  • After Royal Arsenal closure
  • Thamesmead Street History
  • Royal Arsenal Co-operative Society (RACS)
  • The Berkeley Group PLC - Royal Arsenal
  • RA Researchers required
  • Research text search
  • Did you know?
    • Martello Towers
  • Tour booking form
  • School Projects
  • RAWHS Membership
  • Upload History files here
  • About RAH
  • Contact
  • About

Building history

​Each building had a unique area and number assignment.
Royal Arsenal Buildings
Your browser does not support viewing this document. Click here to download the document.
BUILDING 22 - Central Offices or MyHQ
Building 22 (Central Offices or MyHQ) An office building for central staff was built south of Verbruggen’s House in 1888–90, but the separate departments continued in their own offices. In 1902 an Ordnance Factories committee was set up to enquire into cost accounting, a matter that concerned H. F. Donaldson as Deputy DirectorGeneral. One of its recommendations in 1904 was that the offices of the Arsenal’s departments should be brought together. Donaldson evidently anticipated this conclusion, as designs for central offices were being made in 1903. Government approval was obtained and a massive office complex went up in 1905–11 in front of the Shot and Shell Foundry, displacing the Carriage Department offices. The partially completed building first came into use in 1908 to serve as the administrative centre of the entire Arsenal, then about three miles long. An outside architect, James Osborne Smith, perhaps best known for the London Library in St James’s Square, had been brought in to design what is, progressively for its date, a wholly steel-framed building. Earlier in his career Osborne Smith had been engaged in the Office of Works on the fitting up of the Natural History Museum and he was a close friend of Sir Henry Tanner, a structural innovator. Col. Arthur Henry Bagnold, RE, was responsible for supervising the works at the Arsenal, and steel was supplied by Dorman Long & Co. of Middlesbrough. It may be that the building was structurally up to date in another respect – Hennebiquesystem reinforced-concrete foundation piles were supplied to the War Office in Woolwich in 1905. They were probably for this project; poor ground conditions would have been a concern. The offices are a loosely rectangular aggregation of blocks around an internal service courtyard, rising three storeys above a basement, with some attics. The internal frame carries elevations of stock brick, dressed with red brick and stone, in a heavy neo-Georgian style with Baroque touches. The main southern part of the entrance front to the west is symmetrical with projecting ashlar to its centre and ends. There is rustication around the main central entrance arch which bears the date 1908. Above, a pediment carries the Royal Cypher of King Edward VII. Another stone entrance bay to the north has Royal Arms in its pediment. The plainer east side has a nearly flat elevation of thirty-four bays. In the courtyard cream-glazed brick elevations were linked by a covered bridge at first-floor level in latticed steelwork, an early addition that was removed around 2005. Inside, along with the steel frame, there were concrete floors above the lower storeys and internal walls of concrete poured in situ. The main entrance hall had a coffered ceiling with marbled columns and pilasters. It led to the principal staircase which rose round a lift well with ornamental iron balustrading. Other staircases were lined with glazed brick. The best offices, for the several superintendents, were on the first floor in the main part of the west range. On the top floor there was a drawing office, the superintendents’ mess, and, from 1917, a telephone exchange. The basement was reinforced for use as an air-raid shelter in the Second World War. The building did suffer a direct hit and its southern parts had to be reconstructed. Attics were extended to the south in 1967–8 when the complex became a headquarters for defence inspection (quality assurance) directorates. In 2004–7 Berkeley Homes replaced those additions and added a further additional set-back storey in a conversion to provide 388 flats, with a shop in the northern entrance archway. For this Broadway Malyan were architects, and the building, thoroughly refenestrated, was renamed ‘MyHQ’
Research in progress (February 2017)


​Help Keep RAH History Alive
Due to increased web hosting and storage costs, your donation will help cover the high costs of running the Royal Arsenal History website and fund new archival devices and digital storage. Please click the donate button below for options. 


To All Readers: We value accuracy and strive to provide reliable information. If you encounter any inaccuracies or broken links, please let us know; your feedback is appreciated! Contact us here with your suggestions.
​
Copyright Notice: All content on www.royal-arsenal-history.com is protected by copyright and belongs to their respective owners, unless otherwise stated. Any unauthorised use of material is prohibited.  ​A credit to royal-arsenal-history.com is required for any published related material. In some cases, we may request a donation to help maintain this website.


For permission or any issues, please contact the website administrator via this email link. ​

© www.royal-arsenal-history.com (2025)
Privacy policy ​